March 4, 2020
Funds are being raised to prepare an engineering study and scope of work documents for the Charlevoix Connector, which will connect the Little Traverse Wheelway to Downtown Charlevoix with a multi-use, non-motorized trail. The Charlevoix County Community Foundation recently awarded $6,200 for this preliminary engineering work. Both the City of Charlevoix and Charlevoix Township have contributed funds to the project as well.